no code implementations • 27 Aug 2022 • Xianbang Chen, Yikui Liu, Lei Wu
Generally, system operators conduct the economic operation of power systems in an open-loop predict-then-optimize process: the renewable energy source (RES) availability and system reserve requirements are first predicted; given the predictions, system operators solve optimization models such as unit commitment (UC) to determine the economical operation plans accordingly.