Short-term Operational Planning Problem of the Multiple-Energy Carrier Hybrid AC/DC Microgrids

23 Dec 2020  ·  Reza Bayani, Mohammed Bushlaibi, Saeed D. Manshadi ·

In this paper, the short-term operation problem for a multiple energy carrier hybrid AC/DC microgrid is discussed. The hybrid microgrid consists of AC and DC parts, which are connected by means of inverters as well as natural gas network. The microgrid includes photovoltaic (PV) unit, wind turbine (WT), battery storage unit and gas-fired microturbines. A mixed integer linear programming is formed to minimize the overall cost of the microgrid including cost of natural gas supply, the value of lost load and battery degradation cost. The presented case study explored the importance of inverter characteristics and pipeline capacity.

PDF Abstract
No code implementations yet. Submit your code now

Tasks


Datasets


  Add Datasets introduced or used in this paper

Results from the Paper


  Submit results from this paper to get state-of-the-art GitHub badges and help the community compare results to other papers.

Methods


No methods listed for this paper. Add relevant methods here