Run-of-Mine Stockyard Recovery Scheduling and Optimisation for Multiple Reclaimers

23 Dec 2021  ·  Hirad Assimi, Ben Koch, Chris Garcia, Markus Wagner, Frank Neumann ·

Stockpiles are essential in the mining value chain, assisting in maximising value and production. Quality control of taken minerals from the stockpiles is a major concern for stockpile managers where failure to meet some requirements can lead to losing money. This problem was recently investigated using a single reclaimer, and basic assumptions. This study extends the approach to consider multiple reclaimers in preparing for short and long-term deliveries. The engagement of multiple reclaimers complicates the problem in terms of their interaction in preparing a delivery simultaneously and safety distancing of reclaimers. We also consider more realistic settings, such as handling different minerals with different types of reclaimers. We propose methods that construct a solution step by step to meet precedence constraints for all reclaimers in the stockyard. We study various instances of the problem using greedy algorithms, Ant Colony Optimisation (ACO), and propose an integrated local search method determining an efficient schedule. We fine-tune and compare the algorithms and show that the ACO combined with local search can yield efficient solutions.

PDF Abstract
No code implementations yet. Submit your code now

Datasets


  Add Datasets introduced or used in this paper

Results from the Paper


  Submit results from this paper to get state-of-the-art GitHub badges and help the community compare results to other papers.

Methods


No methods listed for this paper. Add relevant methods here