Grid-Aware On-Route Fast-Charging Infrastructure Planning for Battery Electric Bus with Equity Considerations: A Case Study in South King County

14 Sep 2023  ·  Xinyi Zhao, Chaoyue Zhao, Grace Jia ·

The transition from traditional bus fleets to zero-emission ones necessitates the development of effective planning models for battery electric bus (BEB) charging infrastructure. On-route fast charging stations, distinct from on-base charging stations, present unique challenges related to safe operation and power supply capacity, making it difficult to control grid operational costs. This paper establishes a novel framework that integrates the bus route network and power network, which leverages the inter-dependency between both networks to optimize the planning outcomes of on-route BEB charging stations in South King County. The problem is formulated as a mixed-integer second-order cone programming model, aiming to minimize the overall planning cost, which includes investments in charging equipment, power facility, and grid operation. Furthermore, fairness measurements are incorporated into the planning process, allowing for the consideration of both horizontal transit equity and vertical transit equity based on different zone merging criteria within the county's existing census tracts. The results of this planning model offer valuable insights into achieving both economic efficiency and social justice in the design of on-route charging facilities for BEBs in South King County.

PDF Abstract

Datasets


  Add Datasets introduced or used in this paper

Results from the Paper


  Submit results from this paper to get state-of-the-art GitHub badges and help the community compare results to other papers.

Methods


No methods listed for this paper. Add relevant methods here